• Skip to primary navigation
  • Skip to main content
Brian's Susquehanna Thruway Project

CSVT Aerial Pictures

Pictures of the Central Susquehanna Valley Thruway Project

  • Home
  • CSVT Project
    • River Bridge
    • Route 15
    • Route 147
  • Donate
  • About Me
  • Contact

April 28, 2017 Route 147

You are here: Home / CSVT Project / April 28, 2017 Route 147

April 28, 2017

Here the crews are continuing to move a lot of ground and working on the new ridge rd layout.

IMG 20170428 193617850 HDR
IMG 20170428 193617850 HDR
IMG 20170428 193500493 HDR
IMG 20170428 193500493 HDR
IMG 20170428 193551999
IMG 20170428 193551999
IMG 20170428 193514955 HDR
IMG 20170428 193514955 HDR
IMG 20170428 193432080
IMG 20170428 193432080
IMG 20170428 193208917 HDR
IMG 20170428 193208917 HDR
IMG 20170428 193422037
IMG 20170428 193422037
IMG 20170428 193213879 HDR
IMG 20170428 193213879 HDR
IMG 20170428 193416623 HDR
IMG 20170428 193416623 HDR
IMG 20170428 193203430 HDR
IMG 20170428 193203430 HDR
IMG 20170428 193307252 HDR
IMG 20170428 193307252 HDR

Filed Under: CSVT Project, Route 147

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Brian Benfer, CSVT Aerial Pictures. All Rights Reserved. CSVT Aerial Pics on Facebook. Site by Projects by Peggy, Inc.