Here are more pictures from when I was up on March 12. These show the development along Route 15. It seems they are always moving dirt. They are also
January 26, 2018 Route 15
Here is Route 15 on January 26. You can see that dirt continues to be moved. They are also putting in piping for drainage. The wall continues to be
January 10, 2018 Route 15
Here are some pictures from January 10 of the work being done along Route 15. There is a lot of excavating of the ground being done.
December 21, 2017 Route 15
Here's the last batch of pictures from my December 21st flight. These were all from the Route 15 side.
Winter flyover of the CSVT – Video
Here's a video from one of my recent flyovers. I started on the Route 147 side in this video and worked across the river to the Route 15 side. You
December 5, 2017 Route 15
They are still moving lots of ground and starting to expand the road to the south. The wall is now constructed along Route 15 now. It looks as if
Late summer 2017 Route 15
This time around, I was able to capture the temporary bridge that was installed on the Route 15 side for construction equipment to move across the
Summer 2017 Route 15
My flight this time showed the crews getting more ground moved and also getting ready for the temporary bridge that will be installed over 15. They
October 21, 2016 Photos
Starting to do prep work for the foundation of the piers, still moving dirt on both the route 15 and 147 side of the river. Another beautiful day to
October 15, 2016 Photos
At this point it was mostly earth moving and ground preparation. The causeway was being built in order to begin the work on piers. In this set of
September 23, 2016 Route 15
Here are some pictures of the crews bringing in the cranes for the piers and continuing to move dirt near route 15, another beautiful summer day to