• Skip to primary navigation
  • Skip to main content
Brian's Susquehanna Thruway Project

CSVT Aerial Pictures

Pictures of the Central Susquehanna Valley Thruway Project

  • Home
  • CSVT Project
    • River Bridge
    • Route 15
    • Route 147
  • Donate
  • About Me
  • Contact

Late summer 2017 Bridge

You are here: Home / CSVT Project / Late summer 2017 Bridge

December 12, 2017

I love seeing the progress on the bridge piers as the project progresses.  These pictures were taken as the crews are installing the forms on the top of a pier for another concrete pour.

20171128173337
20171128173337
20171128173332
20171128173332
20171128173312
20171128173312
20171128173323
20171128173323
20171128173320
20171128173320
20171128173142
20171128173142
20171128173125
20171128173125
20171128173130
20171128173130
20171128172822
20171128172822
20171128173139
20171128173139
20171128172731
20171128172731
20171128172518
20171128172518
20171128172727
20171128172727
20171128172521
20171128172521

Filed Under: CSVT Project, River Bridge

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Brian Benfer, CSVT Aerial Pictures. All Rights Reserved. CSVT Aerial Pics on Facebook. Site by Projects by Peggy, Inc.