Late summer 2017 Route 15

You are here: Home / CSVT Project / Late summer 2017 Route 15

August 20, 2017

This time around, I was able to capture the temporary bridge that was installed on the Route 15 side for construction equipment to move across the highway without disrupting traffic.

20180103162228
20180103162228
20180103162224
20180103162224
20180103163218
20180103163218
20180103162300
20180103162300
20180103162330
20180103162330

Filed Under: CSVT Project, Route 15