August 14, 2017

Late summer 2017 Bridge

The bridge piers are advancing along nicely.  Several of the piers are nearing completion.  It's amazing to see the workers up in the rebar.

Filed Under: CSVT Project, River Bridge

July 20, 2017

Summer 2017 Route 15

My flight this time showed the crews getting more ground moved and also getting ready for the temporary bridge that will be installed over 15.  They

Filed Under: CSVT Project, Route 15

July 20, 2017

Summer 2017 Bridge

Lots of progress on the bridge piers since the last update.  It's really amazing to see the construction workers and how they do their jobs from

Filed Under: CSVT Project, River Bridge

July 20, 2017

Summer 2017 Route 147

This was a beautiful summer day to be flying.  This time I was able to get some pictures of the piers installed for a bridge.  The crews have moved

Filed Under: Route 147

April 28, 2017

April 28, 2017 Bridge

These are photos of the bridge piers beginning to go up for the new Susquehanna River Bridge.

Filed Under: CSVT Project, River Bridge

April 28, 2017

April 28, 2017 Route 147

Here the crews are continuing to move a lot of ground and working on the new ridge rd layout.

Filed Under: CSVT Project, Route 147

April 14, 2017

2016-2017 Winter Photos

Here the crews are getting rebar installed for the base of the piers.  Also shown are some pictures of the trees that were cleared along route 147 for

Filed Under: CSVT Project, River Bridge, Route 147

October 21, 2016

October 21, 2016 Photos

Starting to do prep work for the foundation of the piers, still moving dirt on both the route 15 and 147 side of the river. Another beautiful day to

Filed Under: CSVT Project, River Bridge, Route 147, Route 15

October 15, 2016

Summer 2016

Here's some shots of the crews installing the new power line poles and moving the old poles out of the way for the eventual new highway on the 147

Filed Under: CSVT Project

October 15, 2016

October 15, 2016 Photos

At this point it was mostly earth moving and ground preparation. The causeway was being built in order to begin the work on piers. In this set of

Filed Under: CSVT Project, Route 147, Route 15

September 23, 2016

September 23, 2016 Route 15

Here are some pictures of the crews bringing in the cranes for the piers and continuing to move dirt near route 15, another beautiful summer day to

Filed Under: CSVT Project, Route 15

May 26, 2016

My first pictures May 2016

It was awesome to watch the amount of dirt being moved and start of the progress and the causeway being built.

Filed Under: CSVT Project

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 3
  • Page 4
  • Page 5

© Brian Benfer, CSVT Aerial Pictures. All Rights Reserved. CSVT Aerial Pics on Facebook. Site by Projects by Peggy, Inc.